← All packages
North Carolina
North Carolina Solar PV Wind Load Certification Package
For residential rooftop solar anywhere in North Carolina, in the letter format the NC Department of Insurance and local inspectors accept under the statewide solar guidance.
- Price
- $499
- Turnaround
- 2–3 business days
- Delivered as
- PE-sealed PDF
What you get
- A wind uplift certification letter signed and sealed by a North Carolina Professional Engineer
- Site-specific wind pressure calculations
- A structural review of the panel mounting layout and attachments
- Anchorage and load distribution review
- The letter format accepted across NC jurisdictions
- A permit-ready PDF: the sealed letter plus the calculation pages, ready to upload to the permit portal.
What we need from you
- 1The property address (and the permit number if you have one).
- 2The array layout, panel model and count
- 3Racking and attachment details, and the roof covering (shingle, metal or tile)
- 4Roof framing information if the roof is older or has two layers
- 5Photos, a sketch or the plans. Phone photos are fine.
If anything is missing we ask before work starts. Pay the set price at the end of the request; a licensed engineer confirms the scope before any work begins.
Start the request · $499Covers
- Shingle and metal roof arrays
- Coastal counties in the 140 mph and higher zones (Dare, Onslow, New Hanover, Carteret and others)
- Older roofs and double-layer roofing
- Additions and retrofits
Not this package
- Ground mounts and carports (quoted)
- Commercial arrays (quoted)
Specs
- Design wind speed
- Site-specific, up to 150 mph on the coast
- Risk category
- II (homes and most buildings); other categories on request
- Exposure
- B, C or D, set by the engineer from the site
- Standard
- ASCE 7-16 or 7-22 with the NC Residential Code, as adopted
- Turnaround
- 2–3 business days
Questions
- Is this accepted statewide?
- Yes. The letter follows the uniform solar guidance that NC inspectors work from, so the same document works in every county.
- Does it include a snow or dead-load check?
- The added dead load on the roof framing is reviewed when you send the framing details. Snow is included where the county requires it.
Ready when you are.
Send the project details in about two minutes. A licensed engineer reviews them and tells you what happens next.
Order · $499