Skip to content
← All packages

Boulder, Colorado

Boulder Sign & Foundation Wind Engineering Calculations

For a wall-mounted, projecting or freestanding sign in Boulder City or County, where signs that project into the right-of-way, exceed certain heights or sit on a foundation need structural engineering.

Price
$659
Turnaround
2–3 business days
Delivered as
PE-sealed PDF

What you get

  • A structural letter signed and sealed by a Colorado Professional Engineer
  • Wind pressure calculation for the sign area and height
  • Wall-mounted attachment verification (bracket anchorage)
  • Foundation design for freestanding monument or pylon signs
  • Exposure and topographic factors evaluated
  • A permit-ready PDF: the sealed letter plus the calculation pages, ready to upload to the permit portal.

What we need from you

  1. 1The property address (and the permit number if you have one).
  2. 2The sign drawing: dimensions, weight, mounting height, how it attaches (brackets, posts, footing)
  3. 3For wall signs: the wall construction (masonry, wood frame, metal panel)
  4. 4Photos, a sketch or the plans. Phone photos are fine.

If anything is missing we ask before work starts. Pay the set price at the end of the request; a licensed engineer confirms the scope before any work begins.

Start the request · $659

Covers

  • Retail and multi-tenant center signs
  • Freestanding monument and pylon signs
  • Projecting blade signs on facades
  • Office park and commercial real-estate signage
  • Channel letter wall signs

Not this package

  • Billboards and signs over 20 ft tall (quoted)
  • Electrical for illuminated signs

Specs

Design wind speed
150–165 mph (City) or site-specific (County)
Topographic factor
Kzt evaluated in the City; County IRC projects use 1.0
Risk category
II (homes and most buildings); other categories on request
Standard
ASCE 7-16 or 7-22 with the local code, whichever the jurisdiction adopts
Foundation
Included for freestanding signs
Turnaround
2–3 business days

Questions

Does the sign company’s drawing count?
It is the starting point. The city wants a Colorado PE to confirm the anchorage or foundation for Boulder’s wind; that is what the letter adds.

Ready when you are.

Send the project details in about two minutes. A licensed engineer reviews them and tells you what happens next.

Order · $659