Skip to content
← All packages

Boulder, Colorado

Boulder Roof-Mounted Solar Wind Certification

For rooftop solar in the City of Boulder or unincorporated Boulder County, written to the county checklist: wind at 150–165 mph, snow, and the roof’s capacity for the added system.

Price
$559
Turnaround
2–3 business days
Delivered as
PE-sealed PDF

What you get

  • A structural letter signed and sealed by a Colorado Professional Engineer
  • Roof dead-load and framing evaluation
  • Site-specific wind load (City fixed speeds or the County SEAC map)
  • Snow load and load-combination checks
  • Rail attachment spacing verification
  • A permit-ready PDF: the sealed letter plus the calculation pages, ready to upload to the permit portal.

What we need from you

  1. 1The property address (and the permit number if you have one).
  2. 2Array layout, panel model and count; racking and attachment details
  3. 3Roof framing: rafter or truss size and spacing, roof covering, and photos of the attic if you can
  4. 4City or County jurisdiction (we confirm it)

If anything is missing we ask before work starts. Pay the set price at the end of the request; a licensed engineer confirms the scope before any work begins.

Start the request · $559

Covers

  • Flush-mounted residential arrays
  • Tilted arrays above the ridge
  • Battery backup and hybrid systems
  • City and County projects

Not this package

  • Ground mounts (quoted)
  • Commercial roofs (quoted)
  • Roof reinforcement design if the framing is short (quoted after the check)

Specs

Design wind speed
150–165 mph (City) or site-specific (County SEAC map)
Topographic factor
Kzt evaluated in the City; County IRC projects use 1.0
Snow
Ground snow per the Boulder County map
Risk category
II (homes and most buildings); other categories on request
Standard
ASCE 7-16 or 7-22 with the local code, whichever the jurisdiction adopts
Turnaround
2–3 business days

Questions

Why is Boulder different?
Boulder has its own wind map and a special wind region with speeds well above the national map, plus a county checklist that asks for specific items. This letter is written to that checklist.
Does it include the electrical or the plan set?
No. This is the structural and wind letter for the permit. Your installer’s plan set and electrical sheets stay theirs.

Ready when you are.

Send the project details in about two minutes. A licensed engineer reviews them and tells you what happens next.

Order · $559