← All packages
Florida
PV Solar Panel Wind Load Certification (Roof-Mounted)
For a roof-mounted solar array in Florida, HVHZ included, when the permit wants the uplift on the array at your address and proof the rails, attachments and anchors can take it.
- Price
- $499
- Turnaround
- 2–3 business days
- Delivered as
- PE-sealed PDF
What you get
- A certification letter signed and sealed by a Florida Professional Engineer
- Site-specific ASCE 7-22 pressures with a roof-zone uplift summary (zones 1 to 3)
- Tributary-area loads per panel or panel group
- Verification of rail, anchor and standoff capacities when you provide the racking data
- FBC and HVHZ compliance language the reviewers expect
- A permit-ready PDF: the sealed letter plus the calculation pages, ready to upload to the permit portal.
What we need from you
- 1The property address (and the permit number if you have one).
- 2The array layout on the roof (the installer’s plan or a marked-up aerial), panel model and count
- 3Racking system and attachment: manufacturer, model, spacing, and the roof covering
- 4Photos, a sketch or the plans. Phone photos are fine.
If anything is missing we ask before work starts. Pay the set price at the end of the request; a licensed engineer confirms the scope before any work begins.
Start the request · $499Covers
- Residential rooftop solar on shingle, tile or metal roofs
- Flush-mount and tilt-rack systems
- Rail-based and curb-mounted installations
- Retrofits that need a PE review for the permit
Not this package
- Ground mounts and carports (quoted)
- Commercial flat-roof arrays over 10 kW (quoted)
- Roof framing upgrades if the roof cannot carry the array (quoted after the check)
Specs
- Design wind speed
- Site-specific per FBC 2023 (8th ed.) / ASCE 7-22; HVHZ speeds where they apply
- Risk category
- II (homes and most buildings); other categories on request
- Exposure
- C or D, site-specific
- Zones
- Roof zones 1, 2 and 3
- Method
- ASCE 7-22 Chapter 30 Part 4 (rooftop solar) and Chapter 29 where applicable
- Turnaround
- 2–3 business days
Questions
- Does it cover the roof structure too?
- The letter addresses wind on the array and its attachments. A roof framing capacity check for the added weight is included when you send the framing information; otherwise it is a separate item.
- My installer already has an engineering letter from the racking maker. Why another?
- Racking letters are generic. Florida permits ask for pressures at your address, roof height and zone, and a licensed Florida PE’s seal on that site-specific check.
Ready when you are.
Send the project details in about two minutes. A licensed engineer reviews them and tells you what happens next.
Order · $499