Skip to content
← All packages

Florida

PV Solar Panel Wind Load Certification (Roof-Mounted)

For a roof-mounted solar array in Florida, HVHZ included, when the permit wants the uplift on the array at your address and proof the rails, attachments and anchors can take it.

Price
$499
Turnaround
2–3 business days
Delivered as
PE-sealed PDF

What you get

  • A certification letter signed and sealed by a Florida Professional Engineer
  • Site-specific ASCE 7-22 pressures with a roof-zone uplift summary (zones 1 to 3)
  • Tributary-area loads per panel or panel group
  • Verification of rail, anchor and standoff capacities when you provide the racking data
  • FBC and HVHZ compliance language the reviewers expect
  • A permit-ready PDF: the sealed letter plus the calculation pages, ready to upload to the permit portal.

What we need from you

  1. 1The property address (and the permit number if you have one).
  2. 2The array layout on the roof (the installer’s plan or a marked-up aerial), panel model and count
  3. 3Racking system and attachment: manufacturer, model, spacing, and the roof covering
  4. 4Photos, a sketch or the plans. Phone photos are fine.

If anything is missing we ask before work starts. Pay the set price at the end of the request; a licensed engineer confirms the scope before any work begins.

Start the request · $499

Covers

  • Residential rooftop solar on shingle, tile or metal roofs
  • Flush-mount and tilt-rack systems
  • Rail-based and curb-mounted installations
  • Retrofits that need a PE review for the permit

Not this package

  • Ground mounts and carports (quoted)
  • Commercial flat-roof arrays over 10 kW (quoted)
  • Roof framing upgrades if the roof cannot carry the array (quoted after the check)

Specs

Design wind speed
Site-specific per FBC 2023 (8th ed.) / ASCE 7-22; HVHZ speeds where they apply
Risk category
II (homes and most buildings); other categories on request
Exposure
C or D, site-specific
Zones
Roof zones 1, 2 and 3
Method
ASCE 7-22 Chapter 30 Part 4 (rooftop solar) and Chapter 29 where applicable
Turnaround
2–3 business days

Questions

Does it cover the roof structure too?
The letter addresses wind on the array and its attachments. A roof framing capacity check for the added weight is included when you send the framing information; otherwise it is a separate item.
My installer already has an engineering letter from the racking maker. Why another?
Racking letters are generic. Florida permits ask for pressures at your address, roof height and zone, and a licensed Florida PE’s seal on that site-specific check.

Ready when you are.

Send the project details in about two minutes. A licensed engineer reviews them and tells you what happens next.

Order · $499