← All packages
Florida
Roofing Wind Load Letter (HVHZ)
For a new roof or re-roof in Miami-Dade, Broward or Palm Beach, when the permit package needs uplift pressures by roof zone, the RAS 127 tile calculation, and the HVHZ roofing forms.
- Price
- $659
- Turnaround
- 2–3 business days
- Delivered as
- PE-sealed PDF
What you get
- A roofing wind load letter signed and sealed by a Florida Professional Engineer
- ASCE 7-22 uplift pressures for roof zones 1, 2 and 3 (and 1′ on low slopes) at your address
- RAS 127 tile moment calculations when the roof is tile
- The NOAs for the roof covering and underlayment referenced in the letter
- The HVHZ Uniform Roofing Application form, completed
- A marked-up roof sketch when one is available
- A permit-ready PDF: the sealed letter plus the calculation pages, ready to upload to the permit portal.
What we need from you
- 1The property address (and the permit number if you have one).
- 2Roof covering: tile, shingle or metal, with the product NOA
- 3Roof type and slope, mean roof height, and the roof plan or an aerial measurement if you have one
- 4Photos, a sketch or the plans. Phone photos are fine.
If anything is missing we ask before work starts. Pay the set price at the end of the request; a licensed engineer confirms the scope before any work begins.
Start the request · $659Covers
- Concrete and clay tile, mechanically fastened
- Asphalt shingle roofs
- Metal panel roofs
- New roofs and re-roofs on single-family homes
Not this package
- Commercial low-slope roofs and roofs over 60 ft (quoted)
- Adhesive-set tile systems needing a different attachment method (ask)
- Structural repairs to the deck or framing (quoted)
Specs
- Design wind speed
- Site-specific per FBC 2023 (8th ed.) / ASCE 7-22; HVHZ speeds where they apply
- Risk category
- II (homes and most buildings); other categories on request
- Exposure
- C or D, site-specific
- Zones
- Roof zones 1′, 1, 2 and 3
- Method
- ASCE 7-22 Chapter 30; RAS 127 for tile
- Turnaround
- 2–3 business days
Questions
- What does the county actually ask for?
- Most Miami-Dade and Broward permits want the Uniform Roofing Application with the uplift pressures, the product NOAs, and for tile the RAS 127 attachment calculation. All of that is in this package.
- Does it include the roof-to-wall connection or mitigation items?
- No. This is the roofing uplift letter. Wind mitigation inspections and structural retrofits are separate services; ask and we point you to the right one.
- How long does it take?
- Typically 2–3 business days after we have the address, the products and the roof dimensions.
Ready when you are.
Send the project details in about two minutes. A licensed engineer reviews them and tells you what happens next.
Order · $659