← All packages
Boulder, Colorado
Boulder Roof Uplift Wind Certification
For a re-roof permit in the City of Boulder or Boulder County, when the roofing permit needs uplift calculations for the tile, metal or shingle system at your address.
- Price
- $459
- Turnaround
- 2–3 business days
- Delivered as
- PE-sealed PDF
What you get
- A roof uplift letter signed and sealed by a Colorado Professional Engineer
- Wind pressure zone calculations (ASCE 7-16 or 7-22 as adopted)
- RAS 127 uplift calculation when the roof is tile
- Fastener spacing and attachment notes
- Exposure and topographic factors evaluated
- A permit-ready PDF: the sealed letter plus the calculation pages, ready to upload to the permit portal.
What we need from you
- 1The property address (and the permit number if you have one).
- 2Roof covering and product data (manufacturer, model, approval or test report)
- 3Roof slope, mean roof height, and the roof plan or an aerial
- 4Photos, a sketch or the plans. Phone photos are fine.
If anything is missing we ask before work starts. Pay the set price at the end of the request; a licensed engineer confirms the scope before any work begins.
Start the request · $459Covers
- Concrete and clay tile re-roofs
- Class 4 and high-wind shingle replacements
- Light-gauge metal roofing on homes
- Commercial low-slope recover with insulation board (small buildings)
Not this package
- Structural repairs to the deck or framing (quoted)
- Large commercial roofs (quoted)
Specs
- Design wind speed
- 150–165 mph (City) or site-specific (County SEAC map)
- Topographic factor
- Kzt evaluated in the City; County IRC projects use 1.0
- Risk category
- II (homes and most buildings); other categories on request
- Exposure
- B, C or D, set by the engineer from the site
- Standard
- ASCE 7-16 or 7-22 with the local code, whichever the jurisdiction adopts
- Turnaround
- 2–3 business days
Questions
- City or County: which am I?
- Tell us the address and we confirm it. The City uses fixed design speeds by location; the County uses a site-specific map. The letter says which was used and why.
- Do you need the old roof removed first?
- No. We work from the product data and the roof geometry; the letter goes in with the permit before tear-off.
Ready when you are.
Send the project details in about two minutes. A licensed engineer reviews them and tells you what happens next.
Order · $459