← All packages
Most jurisdictions
EPA & Wind Load Analysis Report — Pole-Mounted Fixture
For a solar streetlight, camera, EV charger head, sign or other fixture going on a pole, anywhere in the US: the EPA and the wind force at your location, so the pole can be chosen or checked.
- Price
- $450
- Turnaround
- 2–3 business days
- Delivered as
- PE-sealed PDF
What you get
- A PE-stamped summary letter with the EPA, the wind force in pounds and the location data
- EPA calculation from the fixture dimensions and drag coefficients (flat panel, box, cylinder)
- Wind load calculation per ASCE 7-22 for the ZIP code or coordinates, at the mounting height
- Exposure category assigned from the terrain (or as you specify)
- ASCE Hazard Tool printout attached
What we need from you
- 1The project location (address or coordinates)
- 2The fixture: description, dimensions and weight, with the cut sheet or a photo (solar panel, light head, battery box, camera, bracket)
- 3Mounting height, or the range you are considering
If anything is missing we ask before work starts. Pay the set price at the end of the request; a licensed engineer confirms the scope before any work begins.
Start the request · $450Covers
- Solar lighting makers sizing poles before deployment
- Municipal agencies and DOT contractors
- Commercial signage designers
- Telecom camera towers and antennas
- EV charging canopies
Not this package
- The pole itself and its foundation (the tower package, or ask)
- Attachments on utility-owned poles needing the utility’s own forms (we can supply the numbers)
Specs
- Wind speed
- ASCE 7-22 hazard map for the location and risk category
- Mounting height
- 10–40 ft standard, or as specified
- Exposure
- B, C or D, set by the engineer from the site
- Method
- ASCE 7-22 Chapter 29 (other structures)
- Turnaround
- 2–3 business days
Questions
- No pole chosen yet. Can I still order?
- Yes. That is the point: get the EPA and the wind force first, then pick a pole rated for it. Our free pole EPA calculator gives a quick screening meanwhile.
- Is it accepted by my city?
- The report is a stamped engineering document for most jurisdictions. Some pole owners want their own forms; the numbers transfer directly.
Ready when you are.
Send the project details in about two minutes. A licensed engineer reviews them and tells you what happens next.
Order · $450