Skip to content
← All packages

Most jurisdictions

EPA & Wind Load Analysis Report — Pole-Mounted Fixture

For a solar streetlight, camera, EV charger head, sign or other fixture going on a pole, anywhere in the US: the EPA and the wind force at your location, so the pole can be chosen or checked.

Price
$450
Turnaround
2–3 business days
Delivered as
PE-sealed PDF

What you get

  • A PE-stamped summary letter with the EPA, the wind force in pounds and the location data
  • EPA calculation from the fixture dimensions and drag coefficients (flat panel, box, cylinder)
  • Wind load calculation per ASCE 7-22 for the ZIP code or coordinates, at the mounting height
  • Exposure category assigned from the terrain (or as you specify)
  • ASCE Hazard Tool printout attached

What we need from you

  1. 1The project location (address or coordinates)
  2. 2The fixture: description, dimensions and weight, with the cut sheet or a photo (solar panel, light head, battery box, camera, bracket)
  3. 3Mounting height, or the range you are considering

If anything is missing we ask before work starts. Pay the set price at the end of the request; a licensed engineer confirms the scope before any work begins.

Start the request · $450

Covers

  • Solar lighting makers sizing poles before deployment
  • Municipal agencies and DOT contractors
  • Commercial signage designers
  • Telecom camera towers and antennas
  • EV charging canopies

Not this package

  • The pole itself and its foundation (the tower package, or ask)
  • Attachments on utility-owned poles needing the utility’s own forms (we can supply the numbers)

Specs

Wind speed
ASCE 7-22 hazard map for the location and risk category
Mounting height
10–40 ft standard, or as specified
Exposure
B, C or D, set by the engineer from the site
Method
ASCE 7-22 Chapter 29 (other structures)
Turnaround
2–3 business days

Questions

No pole chosen yet. Can I still order?
Yes. That is the point: get the EPA and the wind force first, then pick a pole rated for it. Our free pole EPA calculator gives a quick screening meanwhile.
Is it accepted by my city?
The report is a stamped engineering document for most jurisdictions. Some pole owners want their own forms; the numbers transfer directly.

Ready when you are.

Send the project details in about two minutes. A licensed engineer reviews them and tells you what happens next.

Order · $450