Camera & ALPR poles
Sealed calcs before the camera pole goes in the ground.
Cities, counties and right-of-way owners increasingly ask for a sealed wind load package before a license plate reader or security camera pole is approved. We produce it for new poles, their foundations, and attachments to existing light poles.
- ASCE 7-22 Ch. 29
- New pole or existing pole
- Foundation / embedment
- All licensed states
- Per-site pricing for rollouts
- Custom quotes typically $1,000–$2,100
What you get
- Wind pressures on the pole, camera head, solar panel and mounting hardware at the site wind speed, risk category and exposure
- Bending, shear and deflection checks on the pole section
- Direct-embedment depth or concrete foundation sizing with anchor verification, from stated soil assumptions or your geotech data
- For an existing light or parking-lot pole: the adequacy check the pole owner wants before the added wind area goes up
- A calculation report signed and sealed by a PE licensed in the project state, formatted for the permit portal
What we need
- Site address (or the site list)
- Pole height and section, or the vendor pole spec sheet
- Camera, bracket and solar panel model or dimensions, and the mounting height
- Photos for existing-pole checks; soil data if you have it
Send what you have. We’ll review it and let you know what else we need.
Fixed-price packages
Order online, pay once.
- Do ALPR and Flock-style camera poles need wind load calculations?
- Often, yes. Many building departments and right-of-way owners require sealed calculations before permitting a new camera pole or an attachment to an existing one. Requirements vary by jurisdiction and pole owner, so a sealed package is usually the fastest way through plan review.
- Which code do you use?
- ASCE 7-22, or the edition the local jurisdiction has adopted, with the site-specific wind speed, exposure category and the effective projected area of the equipment on the pole. In Florida the letter cites the Florida Building Code as well.
- The camera is going on an existing street light. Is that a smaller job?
- Usually. We check the added EPA and moment against the pole and its base; when the owner prefers a short-form document over a full calc package, a sealed engineer letter covers it.
- How fast, and how is a rollout priced?
- Typically 1–3 business days for a single-pole package, with expedited options when a permit deadline is near. Multi-site programs are quoted as a batch with a flat per-site price.
Need wind calculations for your permit?
Send the project details in about two minutes. A licensed engineer reviews them and tells you what happens next.
Request wind calculations